Final | 4/18/2017 | 4/19/2017 | 4/19/2017 | P | PASS |
Daryl Spivey
|
|
|
Gas piping and plumbing final for phase 1. Phone #: ###-#### Inspection requested via web by Jason Brashears phase 1 only............ds
|
Plumbing Rough-in | 4/2/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Daryl Spivey
|
|
|
Gas supply piping under 60 pound air test. Pressure gauge is located at meter bar on North side of structure. Gas supply piping is for one future rtu. Phone #: ###-#### Inspection requested via web by Jason Brashears gas test at 60 lbs ok..........ds
|
Plumbing Rough-in | 3/26/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Daryl Spivey
|
|
|
TI rough-in with the sanitary system under water pressure and the water system under air pressure. Phone #: ###-#### Inspection requested via web by Jason Brashears
|
Groundwork | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Daryl Spivey
|
|
|
Project site is located between existing Jersey Mike''s and Smash Burger. Underground dwv will be under water test. Phone #: ###-#### Inspection requested via web by Jason Brashears
|