Final | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Whitt
|
Final | 3/24/2017 | 3/24/2017 | 3/24/2017 | P | PASS |
Dan Ediger
|
|
|
|
Final | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | FAIL |
Dan Ediger
|
|
|
Contact Robert with any questions Phone #: ###-#### Inspection requested via web by Justin Whitt. Certify RP and add to permit fee
|
Final | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | FAIL |
Dan Ediger
|
|
|
Contact Jason with any questions Phone #: ###-#### Inspection requested via web by Justin Whitt. 1. Gas pressure test needs 30 psi gauge with 20 psi test. 2. Perm cap the 1/2" gas line at the unit heater. 3. Verify nail-ons are pennitraiting wood through the sheetrock. 4. Gap pressure test should have two gas valves at the pressure line.
|
Final | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PEND |
Dan Ediger
|
|
|
Contact Jason with any questions. Phone #: ###-#### Inspection requested via web by Justin Whitt. Run T&P drain to within 6" of the floor. Verifiy gas pipe size and pressure test.
|