Final | 4/3/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Eric Strole
|
|
|
CALL SKYLER WITH QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis
|
Water and/or Sewer | 4/3/2017 | 4/3/2017 | 4/3/2017 | A | PART |
Eric Strole
|
|
|
Sewer complete.Still need tested and camera.
|
Water and/or Sewer | 3/31/2017 | 4/2/2017 | 4/2/2017 | P | CANC |
Eric Strole
|
|
|
220' of sewer installed at 1% at this time.. Still need tested and camera.
|
Water and/or Sewer | 3/31/2017 | 4/2/2017 | 4/2/2017 | A | PART |
Eric Strole
|
|
|
135' of sewer installed at 1% at this time.. Still need tested and camera.
|
Water and/or Sewer | 3/31/2017 | 4/1/2017 | 4/1/2017 | P | PART |
Eric Strole
|
|
|
100' of sewer installed at 1% at this time.. Still need tested and camera.
|
Water and/or Sewer | 3/31/2017 | 4/1/2017 | 4/1/2017 | A | PART |
Eric Strole
|
|
|
80' of sewer installed at 1% at this time.. Still need tested and camera.
|
Water and/or Sewer | 3/30/2017 | 3/31/2017 | 3/31/2017 | P | FAIL |
Eric Strole
|
|
|
Please call Skyler at ###-#### with any questions or concerns Phone #: ###-#### Inspection requested via web by Ben Davis-Did not make grade. Need to dig up sewer and relay at 1% test and camera.
|
Water and/or Sewer | 3/30/2017 | 3/31/2017 | 3/31/2017 | A | PART |
Bill VanDegrift
|
|
|
Please call Skyler at ###-#### with any questions or concerns Phone #: ###-#### Inspection requested via web by Ben Davis sewer is at the front of the building, working on sewer connection in the street.
|
Groundwork | 3/30/2017 | 3/31/2017 | 3/30/2017 | P | CANC |
Eric Strole
|
|
|
Please call Skyler at ###-#### with any questions or concerns Phone #: ###-#### Inspection requested via web by Ben Davis
|
Groundwork | 3/30/2017 | 3/31/2017 | 3/30/2017 | A | CANC |
Eric Strole
|
|
|
Please call Skyler at ###-#### with any questions or concerns Phone #: ###-#### Inspection requested via web by Ben Davis
|
Water and/or Sewer | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | PART |
Eric Strole
|
|
|
200' installed. Still need tested and camera.
|
Water and/or Sewer | 3/28/2017 | 3/29/2017 | 3/29/2017 | P | CANC |
Eric Strole
|
|
|
CALL SKYLER WITH QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis
|
Water and/or Sewer | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | CANC |
Eric Strole
|
|
|
CALL SKYLER WITH QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis
|
Water and/or Sewer | 3/27/2017 | 3/28/2017 | 3/28/2017 | P | PART |
Eric Strole
|
|
|
CALL SKYLER WITH QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis-140' of sewer installed so far.
|
Water and/or Sewer | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PART |
Eric Strole
|
|
|
First 100 ft 4 inch sewer from building out towards street installed. Still needs testing and cameraed.
|
Groundwork | 3/27/2017 | 3/28/2017 | 3/27/2017 | P | CANC |
Eric Strole
|
|
|
CALL SKYLER WITH QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis
|
Groundwork | 3/27/2017 | 3/28/2017 | 3/27/2017 | A | CANC |
Eric Strole
|
|
|
CALL SKYLER WITH QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis
|