Final | 7/6/2017 | 7/6/2017 | 7/6/2017 | A | PASS |
Dan Ediger
|
|
|
The electrical not run to the system. System will be tested with the first TI.
|
Final | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PART |
Dan Ediger
|
|
|
evertt Phone #: ###-####. The ejectors need to be wired to the control panal and the system needs to be functunal
|
Groundwork | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Dan Ediger
|
|
|
Evertt Ready now Phone #: ###-####
|
Plumbing Rough-in | 4/24/2017 | 4/25/2017 | 4/26/2017 | P | PART |
Dan Ediger
|
|
|
After hours inspection for 10:00 P.M contact Everett at ###-#### . Waste ok to cover
|
Plumbing Rough-in | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PART |
Dan Ediger
|
|
|
rough-in inspection in corridor as early as possible today, please. Inspection requested via web by Sharon Afinson. Ejector overhead waste and vent ok.
|