Sprinkler (Final) | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 10/19/2017 | 10/19/2017 | 10/25/2017 | | PASS |
Bill VanDegrift
|
|
|
|
Final | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PASS |
Bill VanDegrift
|
|
|
|
Water and/or Sewer | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PART |
Dan Ediger
|
|
|
after 9. OK to cover. Final after backflow certification.
|