Final | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | PASS |
Dan Ediger
|
|
|
Hello! Please call Rick Carter at ###-#### to confirm adjustments have been made after previous inspection.
Thank you! Phone #: ###-#### Inspection requested via web by Nicole Huff
|
Water Heater Final | 5/2/2017 | 5/3/2017 | 5/3/2017 | P | FAIL |
Dan Ediger
|
|
|
1. Install three screws at each flue joint. 2. Use proper transition fittings where cpvc and copper meet on the t&p. 3. Drill a 1/16" hole on the low point of the t&p drain. 4. Run the pan drain out of the crawl. 5. Provide carbon monoxide detectors. 6. fixt the water leak at the flex.
|
Water Heater Final | 4/28/2017 | 5/2/2017 | 5/2/2017 | P | NR |
Dan Ediger
|
|
|
Hello! Please call Phillip @ ###-#### to confirm job is ready for inspection.
Thank you! Phone #: ###-#### Inspection requested via web by Nicole Huff
|
Water Heater Final | 4/28/2017 | 5/2/2017 | 4/28/2017 | P | CANC |
Dan Ediger
|
|
|
Hello,
Please call Dwight @###-#### to confirm job is ready for inspection.
Thank you! Phone #: ###-#### >> Inspection requested via web by Nicole Huff Inspection cancelled from web by: Nicole Huff
|