DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Dan Ediger
|
|
|
|
Final | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PART |
Dan Ediger
|
|
|
if questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. Temp occ ok. Install a means of draindown and blowout of the water system. Install a heat source to the full time pressurized portion of the water line including the rp.
|
Plumbing Rough-in | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PART |
Dan Ediger
|
|
|
if questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. 1. Install a shut-off valves at each building supply on the tower gas line services. 2. Install 3/4" water line in the tower stair shaft per plans. Water line pressure test ok
|
Plumbing Rough-in | 2/19/2018 | 2/20/2018 | 2/20/2018 | A | PART |
Dan Ediger
|
|
|
Commercial Tower Rough In. If there are any questions please contact Larry J. at ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. Burn tower. 2nd floor, ceiling and floor lp test ok. 3rd floor, floor lp pressure test ok. East lp riser pressure test ok. whole tower h2o pressure test ok.
|
Plumbing Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PART |
Dan Ediger
|
|
|
Plumbing Rough In for Commercial Tower. If there are any questions please contact Larry J. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann West side gas test 100psi ok. First floor water ok
|
Plumbing Rough-in | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Dan Ediger
|
|
|
Plumbing Rough In for Commercial Tower. If there are any questions please contact Larry J. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia . Haumann. Roof and deck drains ok
|
PLM-Aging Inspection | 2/7/2018 | 2/7/2018 | 2/7/2018 | | PEND |
Dan Ediger
|
|
|
|
PLM-Aging Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | | PEND |
Dan Ediger
|
|
|
wip
|