Final | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo
|
Card not on site to sign | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo
|
Final | 10/19/2017 | 10/20/2017 | 10/20/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo-Need tempered water to public lavs and need to remove boiler-bib installed upstream of backflow for building.
|
Plumbing Rough-in | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo
|
Other | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | DONE |
Eric Strole
|
|
|
Job walk with inspector at 7:30. Phone #: ###-#### Inspection requested via web by Troy Pherigo-Conferance on drains for outside showers. They are just to rinse off before going in pool. Will pipe to a french drain.
|
Groundwork | 5/11/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo
|
Groundwork | 5/10/2017 | 5/11/2017 | 5/11/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo-Need approved plans on site and need to vent toilets per the 1009 ISPC.
|