Final | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Powell
|
Final | 7/4/2017 | 7/5/2017 | 7/5/2017 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Powell-No corrections made.
|
Final | 6/30/2017 | 7/3/2017 | 7/3/2017 | A | FAIL |
Dan Ediger
|
|
|
2365 code Phone #: ###-#### Inspection requested via web by Randy Powell. 1. Pipe the t&p drainline and secure to between 24" and 6" above finsished grade. ISPC 608.5. 2. A maximum length of 24" flex connector may be used on the water heater. Hard pipe within 24" of the heater.
|
Plumbing Rough-in | 5/17/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Powell
|
Groundwork | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | FAIL |
Dan Ediger
|
|
|
2365 Phone #: ###-#### Inspection requested via web by Randy Powell. There needs to be an approved set of plans on the job showing two restrooms. Permit is for one restroom. Second rest room needs to be reflected on the plumbing permit.
|
Groundwork | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | CANC |
Dan Ediger
|
|
|
2365 Lock box code Phone #: ###-#### >> Inspection requested via web by Randy Powell Inspection cancelled from web by: Randy Powell
|