Final | 10/3/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Joe Kennedy
|
Water and/or Sewer | 10/3/2017 | 10/4/2017 | 10/3/2017 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Joe Kennedy Inspection cancelled from web by: Joe Kennedy
|
Plumbing Rough-in | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Dan Ediger
|
|
|
Ready for test Phone #: ###-#### Inspection requested via web by Joe Kennedy
|
Plumbing Rough-in | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | FAIL |
Dan Ediger
|
|
|
Joe Phone #: ###-####. Add base of stack cleanout. Remove santees from the horizontal drains. Call with questions
|