Final | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dan Ediger
|
|
|
if questions call Josh @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | FAIL |
Dan Ediger
|
|
|
If there are any questions contact Josh C. at ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. 1. Install the dishwasher. 2. Install the water filter downstream of the rp. 3. Provide access to the floor sink. 4. Provide a mininmum of an 1-1/2" air gap on the t&p to floor sink. 5. Complete the installation of the rp drain to the floor sink.
|
Plumbing Rough-in | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Dan Ediger
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | PASS |
Dan Ediger
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|