Final | 12/20/2017 | 12/20/2017 | 12/20/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
Final | 12/17/2017 | 12/18/2017 | 12/18/2017 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. 101: T&P backgrading 102: Leak under ks 103 T&P too far off the ground 104: T&P backgrading K/S trap arm is backgrading.
|
Water and/or Sewer | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | NR |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by david scaggs
|
Plumbing Rough-in | 8/2/2017 | 8/2/2017 | 8/2/2017 | A | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by david scaggs. 1. DWV test failed. Replace broken gauges. 2. Install plate straps at the base of all drain lines at the concrete. 3. 3" cleanouts require 18" clearance. Turn 180 degrees
|
Groundwork | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Dan Ediger
|
|
|
David Phone #: ###-####
|