Groundwork | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Dan Ediger
|
|
|
We are requesting a groundwork inspection at 6am from Dan Ediger. Contact Andy Sifford : ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel. Permit finaled.
|
Final | 6/8/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Dan Ediger
|
|
|
We are requesting a groundwork inspection at 6am from Dan Ediger. Contact Andy Sifford : ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel. Main drain from unit 110 was taken off the grease line from unit 950 (Blimpies) into the main building drain. A flush test was done to verify the grease line is now only on Blimpies and no sewage flows into the grease line.
|