Final | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Eric Strole
|
|
|
call for access info // Casey Phone #: ###-####
|
Final | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | FAIL |
Dan Ediger
|
|
|
Casey Phone #: ###-####. Install a 2" check valve on the outlet side of the ejector check valve. Pipe the t&p valve drain to the outside of the building and drill an 1/8" hole at the low point.
|
Plumbing Rough-in | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Bill VanDegrift
|
|
|
Casey Phone #: ###-#### Casey will send a picture of the sump vent in the floor joist with grade and cut the hub drain waste arm back to 42". ri ok
|
Plumbing Rough-in | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | FAIL |
Dan Ediger
|
|
|
Casey Phone #: ###-####. 1. The horizontal wet vent cannot go into the vertical. 2. Vent the wc and bathtub. 3. Identify where the a/w is going to drain
|
Plumbing Rough-in | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by casey lattimer
|
Plumbing Rough-in | 6/18/2017 | 6/19/2017 | 6/19/2017 | P | CANC |
Dan Ediger
|
|
|
CAN. due to broke watermain Phone #: ###-#### >> Inspection requested via web by casey lattimer
|