Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | A | PASS |
Dan Ediger
|
|
|
shell/core/gas
|
Final | 11/22/2017 | 11/24/2017 | 11/24/2017 | A | NR |
Dan Ediger
|
|
|
JOB CONTACT - RILEY ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 10/17/2017 | 10/18/2017 | 10/18/2017 | A | PART |
Dan Ediger
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Pressure test on the 2" water main through the building ok
|
Med/Gas Systems | 10/17/2017 | 10/18/2017 | 10/18/2017 | A | PASS |
Dan Ediger
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 60" pressure test on all eight meters ok.
|
Plumbing Rough-in | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PART |
Dan Ediger
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Mechanical room vent ok to cover.
|
Other | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Bill VanDegrift
|
|
|
Civil engineer submitted backwater valve on service
|
Other | 8/10/2017 | 8/10/2017 | 8/10/2017 | A | PEND |
Bill VanDegrift
|
|
|
driving by I noticed grading so I stopped and talked to general contractor about the required backwater protection on the sewer service. Left correction notice because the plumber didn't coordinate with the engineer.
|
Groundwork | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PART |
Bill VanDegrift
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER gw test ok, need to check for backwater valve on the building. talked to the plumber, told him to have the engineer address the issue.
|