Final | 7/27/2017 | 7/27/2017 | 7/27/2017 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Final | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore. Plumbing under this permit ok. 1. Install a 3/4" RP backflow assembly for the main filter bank. 2. Install a seperate RP backflow assembly for the ICEE machine. 3. Install RP backflow assemblies on all products that have a filter in the water line such as the coffee machines. call with any questions.
|
Plumbing Rough-in | 7/12/2017 | 7/12/2017 | 7/12/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Groundwork | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|