DOC - Permit Finaled | | | 3/27/2018 | | DONE |
|
|
|
Per Bill this permit can be finaled
|
PLM-Aging Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | | PEND |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Dan Ediger
|
|
|
|
Final | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PART |
Bill VanDegrift
|
|
|
The interceptor for this building is not a flammable liquids interceptor, it was approved by public works pretreatment as a training facillity without the approved flammable interceptor design and venting, this was discussed prior to installation with pretreatment.
|
Water and/or Sewer | 8/22/2017 | 8/22/2017 | 8/24/2017 | P | PASS |
Dan Ediger
|
|
|
|
Final | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Dan Ediger
|
|
|
Includes sewer stub-ins and water service lines.
|
Water Heater Final | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | CANC |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | NR |
Dan Ediger
|
|
|
Pressurized water - Mike Phone #: ###-####
|
Water and/or Sewer | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PART |
Dan Ediger
|
|
|
Mike-water line only Phone #: ###-#### water connection at the meter ok to cover.
|
Water and/or Sewer | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | CANC |
Dan Ediger
|
|
|
Troy Phone #: ###-####. Public works jurisdiciton
|