Final | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Bill VanDegrift
|
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 8/11/2017 | 8/14/2017 | 8/14/2017 | A | PART |
Daryl Spivey
|
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER ejector waste piping and water lines in parking garage tested ok...........ds
|
Plumbing Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PART |
Daryl Spivey
|
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial on stainless steel piping tested ok.........ds
|
Plumbing Rough-in | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | PART |
Daryl Spivey
|
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 6 in. stainless tested for drains above garage level................ds
|