Final | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PASS |
Eric Strole
|
|
|
Darrel looked at everything last week except we did not have the chairs in yet. They are now connected. Thanks Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Final | 8/15/2017 | 8/18/2017 | 8/18/2017 | A | PART |
Daryl Spivey
|
|
|
Temp final not to include dental chairs yet. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Plumbing Rough-in | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Eric Strole
|
|
|
SouthWest entrance door labeled Slattery from old tenet. Phone #: ###-#### Inspection requested via web by Ben Taylor-Test on vac and air pass. Rough-in pass. Need premis protection by final and cannot have an indirect drain in crawl space, have removed by final.
|