Water Heater Final | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Dan Ediger
|
|
|
Please call Andrew prior to arrival @ ###-####. Phone #: ###-#### Inspection requested via web by Maira Guzman
|
Water Heater Final | 8/4/2017 | 8/8/2017 | 8/8/2017 | A | FAIL |
Dan Ediger
|
|
|
Please call Stacy prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Guzman. 1. Add a flex to the electrical where it enters the water heater. 2. Run the t&p in full 3/4" pipe size.
|