Water Heater Final | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Dan Ediger
|
|
|
|
Final | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | NH |
Dan Ediger
|
|
|
REMODEL / ADDITION FINAL TRIM, BATHROOM ; KITCHEN Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field. 1. The 2" overhead requires support at 48" minimum distance; 2. The water closet vent needs to be rolled so the invert is above the center line of the drain.
|
Plumbing Rough-in | 7/28/2017 | 8/1/2017 | 7/31/2017 | A | CANC |
Dan Ediger
|
|
|
CONTACT: JAY BEDSOLE, CONTRACTOR, ###-####: MASTER BATHROOM REMODEL ROUGH IN Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|