Final | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Dan Ediger
|
|
|
Final ** Phone #: ###-#### Inspection requested via web by Nick Drake
|
PLM-Aging Inspection | 4/2/2018 | 4/2/2018 | 4/2/2018 | | PEND |
Dan Ediger
|
|
|
cont to schedule
|
Plumbing Rough-in | 8/30/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Dan Ediger
|
|
|
CALL JORDAN FOR ACCESS CODE TO LOCK BOX ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake. Drill a hole in the t&p drain line at the low point of the drain and shorten the horizonal portion so it isn't in the doorway. This inspection for the new tub/shower install
|
Plumbing Rough-in | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Dan Ediger
|
|
|
This is a reinspection please call matt with any questions ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake
|
Plumbing Rough-in | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | FAIL |
Dan Ediger
|
|
|
plumbing rough in call jerry for access ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake. The vent invert on the basement water closet taken off the waste center line. Water ok. Provide a cleanout on the 2" ejector drain outside of the house.
|