Final | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 | | PART |
Eric Strole
|
|
|
|
Water and/or Sewer | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | PART |
Bill VanDegrift
|
|
|
Mick ###-#### Water level at clean out by interceptor sewer test outside of the interceptor along the front of the building both directions to the septic tank ok
|
Water and/or Sewer | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | NR |
Eric Strole
|
|
|
Need to test sewer.
|
Water and/or Sewer | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | PART |
Eric Strole
|
|
|
Test on lift stations pass.
|
Water and/or Sewer | 9/1/2017 | 9/1/2017 | 9/1/2017 | P | PART |
Eric Strole
|
|
|
Start of 24 hr test on lift stations.
|
Water and/or Sewer | 8/28/2017 | 8/29/2017 | 8/29/2017 | P | PART |
Eric Strole
|
|
|
Sewer only - Mick Phone #: ###-####- 300' of 4" sewer east side ok to cover. All sewer still needs tested.
|
Water and/or Sewer | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PART |
Eric Strole
|
|
|
Sewer only - Mick Phone #: ###-####-Test on fuel interceptor pass. Test on both lift stations fail. 1st 200' of 4" sewer east side ok to cover. All sewer still needs tested.
|
Water and/or Sewer | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PART |
Eric Strole
|
|
|
Sewer only - Mick Phone #: ###-####-6" sewer 10' of interceptor. Start of 24 hr test on lift stations.
|
Water and/or Sewer | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | PART |
Eric Strole
|
|
|
Sewer only - Mick Phone #: ###-####-West side of sewer up to 6x4 reducer complete. Start of 24 hr test on fuel interceptor.
|
Water and/or Sewer | 8/25/2017 | 8/25/2017 | 8/25/2017 | A | PART |
Eric Strole
|
|
|
Sewer only - Mick Phone #: ###-####-Section complete ok to cover.
|
Water and/or Sewer | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | CANC |
Eric Strole
|
|
|
Sewer only - Mick Phone #: ###-####
|