Final | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen no access
|
Final | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | FAIL |
Dan Ediger
|
|
|
please call and get code to house Phone #: ###-#### Inspection requested via web by Brian Johansen. 1. Install the laundry sink. 2. Caulk the master shower trim. 3. the master tub valve, hot side, not installed properly.
|
Final | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. no access
|
Plumbing Rough-in | 8/18/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|