DOC - Permit Finaled | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 9/14/2017 | 9/14/2017 | 9/14/2017 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by matt ford. Test sewer and expose all joints back to the new connection.
|
Water and/or Sewer | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by matt ford. Pressure test the water service. Non-approved pipe inside the foundation walls on the sewer.
|