PLM-Aging Inspection | 5/23/2018 | 5/23/2018 | 5/23/2018 | | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Dan Ediger
|
|
|
Contractor never followed up after meter set. Pressure test only
|
Water and/or Sewer | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PART |
Dan Ediger
|
|
|
Water Line Insp, thank you Phone #: ###-#### Inspection requested via web by Sabrina Amidon. Water service ok to cover. Call when the water meter is set.
|
Water and/or Sewer | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PART |
Dan Ediger
|
|
|
Sewer passed ok to cover. The water line is not installed.
|
Water and/or Sewer | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | NR |
Dan Ediger
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Sabrina Amidon. Not under test
|