Final | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by John Treat
|
Final | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | NH |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by John Treat no access.........ds
|
Final | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | FAIL |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by John Treat need to add all new fixtures and install w/h per code............ds
|
Plumbing Rough-in | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Bill VanDegrift
|
|
|
Water system is live. 2 waste test 1 for ejector system and other for the main system Phone #: ###-#### Inspection requested via web by John Treat
ri ok will change permit to a fixture count
|
Groundwork | 9/12/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by John Treat
|