Other | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | CANC |
Daryl Spivey
|
|
|
Backflow assembly has passed test. Inspect tie-in to main and backflow assembly. Phone #: ###-#### Inspection requested via web by Stewart Galbraith
|
Sprinkler (Final) | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Daryl Spivey
|
|
|
Backflow assembly has passed test. Inspect tie-in to main and backflow assembly. Phone #: ###-#### Inspection requested via web by Stewart Galbraith
|
Other | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | PEND |
Daryl Spivey
|
|
|
Backflow assembly and tie-in to main Phone #: ###-#### Inspection requested via web by Stewart Galbraith needs dcva tested for final..........ds
|