Final | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Bill VanDegrift
|
|
|
Please call before you arrive so I can meet you there. Thanks! Phone #: ###-#### Inspection requested via web by Seth Olsen final ok
|
Plumbing Rough-in | 6/6/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Olsen
|
Plumbing Rough-in | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PEND |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Olsen. Conference to go over roughin Homeowner needs to add fixtures to the permit
|
Groundwork | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Dan Ediger
|
|
|
Pressure test passed as well. I have pictures. Phone #: ###-#### Inspection requested via web by Seth Olsen
|
Groundwork | 11/1/2017 | 11/3/2017 | 11/3/2017 | A | PART |
Dan Ediger
|
|
|
Pressure test. Sewer ok to cover. Ground work consultation.
|
Groundwork | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PART |
Dan Ediger
|
|
|
Please bring your pressure testing equipment. Thanks! Phone #: ###-#### Inspection requested via web by Seth Olsen. Water service ok. Use drainage fittings on the 2" pressure line.
|