Final | 12/8/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 10/17/2017 | 10/20/2017 | 10/20/2017 | A | CANC |
Eric Strole
|
|
|
Water service inspection Phone #: ###-#### Inspection requested via web by Mike Basabe
|
Water and/or Sewer | 10/16/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Eric Strole
|
|
|
Roof drains pass
|
Water and/or Sewer | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | CANC |
Eric Strole
|
|
|
Roof drain inspection Phone #: ###-#### Inspection requested via web by Mike Basabe
|
Water and/or Sewer | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PART |
Bill VanDegrift
|
|
|
Re inspection on domestic water service Phone #: ###-#### Inspection requested via web by Mike Basabe replacement water service ok, partial rainwater system ok to cover prior to test for other utilities to be installed.
|
Water and/or Sewer | 10/10/2017 | 10/11/2017 | 10/11/2017 | P | FAIL |
Eric Strole
|
|
|
Domestic water inspection Onsite foreman, Darrel Carter Phone #: ###-#### Inspection requested via web by Mike Basabe-Water service needs to be 1 1/2". Need to install a RPBA or a PVB with a main and drain for water station and label non-potable.
|
Water and/or Sewer | 10/5/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Eric Strole
|
|
|
Test on interceptor pass
|
Water and/or Sewer | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Eric Strole
|
|
|
Mike Phone #: ###-####-Start of 24 hr test on interceptor.
|
Water and/or Sewer | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | PART |
Eric Strole
|
|
|
Sanitary Sewer - Leak test for grease trap Phone #: ###-#### Inspection requested via web by Mike Basabe-Interceptor is leaking.
|
Water and/or Sewer | 10/3/2017 | 10/4/2017 | 10/3/2017 | A | CANC |
Eric Strole
|
|
|
Interceptor test
|
Plumbing Rough-in | 9/22/2017 | 9/22/2017 | 9/22/2017 | P | PART |
Eric Strole
|
|
|
Underground - Jose Phone #: ###-####-Tie-in of roof drains for fuel canopy pass.
|
Roof Drains | 9/21/2017 | 9/21/2017 | 9/21/2017 | P | FAIL |
Eric Strole
|
|
|
Requesting roof drain inspection. Onsite foreman is Darrel ###-#### Phone #: ###-#### Inspection requested via web by Mike Basabe-Need to use approved material for inside the building.
|