DOC - Permit Finaled | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Dan Ediger
|
|
|
|
Final | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Naillon. Master Rooter must pull a permit for installing the tempering valve and then this permit can be finialed.
|
Final | 10/10/2017 | 10/10/2017 | 10/10/2017 | A | FAIL |
Dan Ediger
|
|
|
Install a tempering valve to control the water temperature to 120 degrees max.
|
Final | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | CANC |
Dan Ediger
|
|
|
Chris Phone #: ###-####. Install a tempering valve to control the temperature to a maximum of 120 degrees. ispc 413.1
|
Plumbing Rough-in | 9/29/2017 | 9/29/2017 | 9/29/2017 | P | PASS |
Dan Ediger
|
|
|
call when on your way ###-#### Phone #: ###-#### Inspection requested via web by Chris Naillon
|
Plumbing Rough-in | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | FAIL |
Bill VanDegrift
|
|
|
Please cal chris at ###-#### when on your way Phone #: ###-#### Inspection requested via web by Chris Naillon provide approved plans, gw ri ok to cover
|