Water and/or Sewer | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 11/28/2017 | 11/29/2017 | 11/29/2017 | P | PART |
Dan Ediger
|
|
|
Water only inspection. Mike Jackson ###-#### is the PM for the Starbucks project. If you could call prior to arriving it would be appreciated. Phone #: ###-#### Inspection requested via web by judy patton. OK to cover with sand, on site, except for two joints.
|
Water and/or Sewer | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PART |
Dan Ediger
|
|
|
Mike Jackson is the Foreman on this project ; if you would give him a call prior to arrival he would appreciate it. Dig ; Lay of Sewer ; Water Lines Thank you Phone #: ###-#### Inspection requested via web by judy patton. Sewer is ok to cover. Grease intercepter will need to be vented from the outlet side not per site drawings.
|