Final | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | PASS |
Bill VanDegrift
|
|
|
Call Buck with any questions. Phone #: ###-#### Inspection requested via web by Ben Davis water line installed over the weekend, left the meter connection open to verify connection, sent pictures of trench. final ok
|