DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Dan Ediger
|
|
|
This permit was reactiveated to inspect a repair on the 2" west riser repair
|
Med/Gas Systems | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Dan Ediger
|
|
|
Propane mein repair. Installed a new propane riser on the West end of the highrise tower. The line was damaged by others. Pressure test 80psi
|
Med/Gas Systems | 10/11/2017 | 10/12/2017 | 10/12/2017 | P | PART |
Dan Ediger
|
|
|
Please schedule this after 2pm. Contact technician is Thomas ###-####. Thank you Phone #: ###-#### Inspection requested via web by Nick Drake. Amend permit to show added work. Recall for final
|
Med/Gas Systems | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | CANC |
Dan Ediger
|
|
|
Gas pressure test call thomas with questions ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake
|
Other | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Daryl Spivey
|
|
|
pressure test Phone #: ###-#### Inspection requested via web by Nick Drake 60 lb test ok.........ds
|
Other | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | CANC |
Daryl Spivey
|
|
|
Pressure test for gas line Phone #: ###-#### >> Inspection requested via web by Nick Drake Inspection cancelled from web by: Nick Drake
|