Final | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Dan Ediger
|
|
|
We are requesting a final re-inspection. Contact Bobby: ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Final | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | FAIL |
Dan Ediger
|
|
|
We are requesting a final inspection. Contact the owner Bobby: ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel. Install a RP backflow assembly for the dishwasher and the dw drain must have an airgap
|
Other | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PART |
Dan Ediger
|
|
|
We are requesting a gas pressure test for the gas line and water heater vent piping. Contact Bobby: ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel. 5# flue test ok. 20# gas pressure test ok. will final after hooking up the water heater.
|