Final | 2/9/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Seward
|
Final | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | FAIL |
Dan Ediger
|
|
|
Install vented double check valves at the coffee the coffee and tea makers. Label all shut off valves as to the location of the appliance served.
|
Final | 1/23/2018 | 1/25/2018 | 1/26/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Seward. 1. Pipe the electric water heater t&p drain to an approved waste location with an air gap. 2. Seperate the carbonator waters from all other lines. 3. Install double check valves at the coffee/tea makers and ice machines.
|
Pressure Test | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Dan Ediger
|
|
|
Gas pressure test Phone #: ###-#### Inspection requested via web by Dennis Seward 20#
|
Plumbing Rough-in | 12/11/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Seward. Verify air hammer arrestors on trim
|
Groundwork | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Dan Ediger
|
|
|
All piping in the concrete must be protecded. Wrap prior to pourning concrete
|
Groundwork | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Seward gw ok
|
Groundwork | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | FAIL |
Dan Ediger
|
|
|
The 4" wyes at the foundation wall are backgrading. Check the wyes by the correction notice.
|
Groundwork | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Seward.. Fittings ok. Need backfill or stake pipe for grade and support
|