Final | 12/21/2017 | 12/22/2017 | 12/22/2017 | P | PASS |
Dan Ediger
|
|
|
Please call for access code. Phone #: ###-#### Inspection requested via web by Jason Gonzalez
|
Final | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Gonzalez. 1. Provide a 1" air gap at the water softener drain. 2. Provide a 15" space on the powder bath water closet from the cabinet.
|
Plumbing Rough-in | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Gonzalez ri ok
|