DOC - Permit Finaled | | | 10/4/2018 | | DONE |
|
|
|
per Chad S. work that was done was all cosmetic-no building permit was required for that portion of work-final inspection passed on 8/29/18
|
Final | 8/29/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Bill VanDegrift
|
|
|
final ok
|
PLM-Aging Inspection | 8/13/2018 | 8/13/2018 | 8/13/2018 | | PEND |
Bill VanDegrift
|
|
|
called, left message
|
Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | P | FAIL |
Bill VanDegrift
|
|
|
Early PM please // Belinda Phone #: ###-#### 1) pipe t& p to floor 2) set dishwasher or plug waste connection at garbage disposal 3) calk toilet
|
Plumbing Rough-in | 3/28/2018 | 3/28/2018 | 3/28/2018 | A | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | CANC |
Dan Ediger
|
|
|
Balinda-call for access Phone #: ###-####
|
Plumbing Rough-in | 3/15/2018 | 3/19/2018 | 3/19/2018 | A | FAIL |
Dan Ediger
|
|
|
Call ahead // Belinda Phone #: ###-####. 1. Provide nail plate and plate strap pipe protection. 2. Install a cleanout at the kitchen sink and lavatory. 3. Install a hard cold line to the kitchen sink. 4. The drainage and vent system is required to be tested by water or air.
|