Final | 9/4/2018 | 9/4/2018 | 9/5/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. The trim is incomplete
|
Final | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Install the floor cleanout in the garage floor. It is in the walkway and will need to be approved materials. The floor drain will need to be permanently capped or primed. Use metal cleanout covers on the garage cleanouts. Reinspection fee applied.
|
Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | P | NR |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM-Aging Inspection | 7/27/2018 | 7/27/2018 | 7/27/2018 | | NR |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. passed 3/1
|
Plumbing Rough-in | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Dan Ediger
|
|
|
can be inspected in the am if you have time Phone #: ###-#### Inspection requested via web by Brian Johansen
|