Final | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Fee due hold. Pay reinspection fee prior to final
|
Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. The garage floor cleanouts must be flush with the floor and glued to the pipe.
|
PLM-Aging Inspection | 8/6/2018 | 8/6/2018 | 8/6/2018 | | NR |
Dan Ediger
|
|
|
wip
|
Plumbing Rough-in | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Run the water lines to the shower through the floor joist and into the wall above the plate line
|
Groundwork | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|