Final | 1/11/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Dan Ediger
|
|
|
i will be ready at 9 Phone #: ###-#### Inspection requested via web by jeff flatt. All work under this permit is ok. A water heater was change prior without a permit and has a flex connector on the t&p. Hard pipe and recall for final.
|
Plumbing Rough-in | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Dan Ediger
|
|
|
should be ready by 2 Phone #: ###-#### Inspection requested via web by jeff flatt
|
Plumbing Rough-in | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | CANC |
Dan Ediger
|
|
|
should be ready by 2 Phone #: ###-#### Inspection requested via web by jeff flatt
|
Other | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Dan Ediger
|
|
|
please atleast call 1/2 hr before // conference // Jeff Phone #: ###-####. Went over fire job on apt. complex
|