Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen The furnace drains and gas line are blocking the water heater. The fau insulation is blocking the wh combustion air. HVAC contractor making changes.
|
PLM-Aging Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 4/11/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|