Final | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Pressure Test | 2/3/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Eric Strole
|
|
|
Ready now, I will swing by early to double check tests. Added plumbing in garage laundry room and gas stub out to unit heater
Phone #: ###-#### Inspection requested via web by Ben Taylor-60 lb gas test pass
|
Plumbing Rough-in | 2/3/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Eric Strole
|
|
|
Ready now, I will swing by early to double check tests Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Plumbing Rough-in | 1/21/2018 | 1/23/2018 | 1/23/2018 | A | PART |
Dan Ediger
|
|
|
partial plumbing rough in and water heater flues Phone #: ###-#### Inspection requested via web by Ben Taylor. Water heater flue passed test. Plumbing south side of the building ok to cover
|
Pressure Test | 1/21/2018 | 1/23/2018 | 1/23/2018 | A | PART |
Dan Ediger
|
|
|
partial gas pressure test Phone #: ###-#### Inspection requested via web by Ben Taylor. Gas pressure ok on south side of the building
|
Plumbing Rough-in | 1/21/2018 | 1/23/2018 | 1/21/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Taylor Inspection cancelled from web by: Ben Taylor
|
Water and/or Sewer | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Dan Ediger
|
|
|
water service stubout
|
Water and/or Sewer | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | NR |
Dan Ediger
|
|
|
Just a 5ft stub out from building. Should be ready mid morning at the latest. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Groundwork | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Dan Ediger
|
|
|
Venting on Interceptor Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Groundwork | 11/15/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Taylor
|