Final | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Dan Ediger
|
|
|
Contact Everett @ ###-#### Inspection requested via web by Sharon Afinson
|
Plumbing Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Dan Ediger
|
|
|
Please contact Everett @ ###-#### Inspection requested via web by Sharon Afinson. Vent for the floor sink and cold water to the hand sink. Point of use water heater on trim
|
Plumbing Rough-in | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Dan Ediger
|
|
|
Everett Phone #: ###-####
|
Groundwork | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Bill VanDegrift
|
|
|
Final ground work inspection. Phone #: ###-#### Inspection requested via web by Sharon Afinson
|
Groundwork | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Dan Ediger
|
|
|
final groundwork inspection Phone #: ###-#### Inspection requested via web by Sharon Afinson
|
Groundwork | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PART |
Dan Ediger
|
|
|
Everett Phone #: ###-####. Ok to pull test. Install two-way cleanouts in both 3" vents.
|