Final | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | PASS |
Eric Strole
|
|
|
Ready after lunch.Thank you Phone #: ###-#### Inspection requested via web by James Paulin
|
Final | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by James Paulin-Need tempered water to public lav.
|
Plumbing Rough-in | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Eric Strole
|
|
|
Late morning or early afternoon. Please call before arriving to make sure it is ready. Thank you, Jim Phone #: ###-#### Inspection requested via web by James Paulin
|
Plumbing Rough-in | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by James Paulin-Ground work installed and covered without inspections. Need to vent shower per the 2009 ispc.
|
Plumbing Rough-in | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PART |
Eric Strole
|
|
|
Building permit has been pulled. Need plumbing RI inspection for cover. Call Jim if you have a question at ###-####. Phone #: ###-#### Inspection requested via web by James Paulin-Partial rough-in laundry & drinking fountain pass.
|
Plumbing Rough-in | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by James Paulin-No building permit yet
|