Final | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Eric Strole
|
|
|
Final inspection close out of all systems for Micron Bld 39. Ben Scott primary contact onsite. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
PLM-Aging Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | PART |
Eric Strole
|
|
|
wip
|
Roof Drains | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PART |
Daryl Spivey
|
|
|
ride along with Eric
|
Roof Drains | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PART |
Eric Strole
|
|
|
Connection of roof drain leaders on North-East corner and East side of Building 39 to storm drain system. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section complete pass.
|
PLM-Aging Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | | PART |
Eric Strole
|
|
|
wip
|
Roof Drains | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | CANC |
Eric Strole
|
|
|
Connection of 8in Roof Drain Leader on North side of building 39 to storm drain system. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Eric Strole
|
|
|
Testing of 18in Waste Water Outfall lines form Building 39 to Federal Way. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Test on waste water pass.
|
Water and/or Sewer | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PART |
Eric Strole
|
|
|
Tie-in complete
|
Water and/or Sewer | 4/16/2018 | 4/17/2018 | 4/17/2018 | P | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 4/12/2018 | 4/16/2018 | 4/16/2018 | A | NR |
Eric Strole
|
|
|
No gain
|
Water and/or Sewer | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | PART |
Eric Strole
|
|
|
Up to 4th manhole of 18" waste water.
|
Water and/or Sewer | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PART |
Eric Strole
|
|
|
Up to 3rd manhole of 18" waste water.
|
Water and/or Sewer | 4/9/2018 | 4/10/2018 | 4/10/2018 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | PART |
Eric Strole
|
|
|
Up to 2nd manhole and 14' out of manhole of 18" waste water installed so far.
|
Water and/or Sewer | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PART |
Eric Strole
|
|
|
Another 35' of 18" installed
|
Water and/or Sewer | 4/6/2018 | 4/9/2018 | 4/9/2018 | A | PART |
Eric Strole
|
|
|
Eric, I set this up , they may call it in also. they were setting the first manhole when I left Friday. Bill,-70' of 18" from 1st manhole towards cup building installed.
|
Water and/or Sewer | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PART |
Bill VanDegrift
|
|
|
Installation of 18in Waste Water line from Building 39 to Federal Way tie-in point. Ben Scott primary contact on site Phone #: ###-#### Inspection requested via web by Craig Fischer setting the first manhole.
|
Water and/or Sewer | 3/21/2018 | 3/22/2018 | 3/23/2018 | A | PART |
Eric Strole
|
|
|
Connection of 18in Waste Water line to Building 39. Ben Scott primary contact onsite Phone #: ###-#### Inspection requested via web by Craig Fischer-Tie-in of 18" waste water to cup building pass. Video of 8" sewer pass. 2 small bellys. Told Micron is ok with sewer.
|
Water and/or Sewer | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Eric Strole
|
|
|
Pressure testing of Potable Water connection to Building 39. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Test pass.
|
Water and/or Sewer | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PART |
Eric Strole
|
|
|
144' installed so far.
|
Water and/or Sewer | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PART |
Eric Strole
|
|
|
!00' off 18" installed so far.
|
Water and/or Sewer | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PART |
Eric Strole
|
|
|
Start of 18in Waste Water line from building 37 to existing connection point in parking lot. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer- 20 ' of 18" in so far.
|
Water and/or Sewer | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Bill VanDegrift
|
|
|
12:00 PM Conferance on sewer 18" ww
|
Water and/or Sewer | 2/5/2018 | 2/6/2018 | 2/6/2018 | P | DONE |
Eric Strole
|
|
|
Conference call with Jake Cook about 18in WW outfall line. Contact Jake Cook onsite Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on sewer.
|
Water and/or Sewer | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PART |
Eric Strole
|
|
|
Finish installation of 8in sewer line on West side of Building 39, installation of sewer manhole on West side of Building 39, connection of 4in to building. Ben Scott on site contact. Phone #: ###-#### Inspection requested via web by Craig Fischer-4" sewer from manhole to building complete. All needs tested.
|
Water and/or Sewer | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | PART |
Eric Strole
|
|
|
Finish installation of 8in sewer line on West side of Building 39, installation of sewer manhole on West side of Building 39, connection of 4in to building. Ben Scott on site contact. Phone #: ###-#### Inspection requested via web by Craig Fischer-28' of 8" sewer from manhole to building installed.
|
Water and/or Sewer | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PART |
Eric Strole
|
|
|
Installation of 8in potable water blow off assembly. West side of bld 39. Morning inspection if able. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-8" potable water to blow off assembly & 4" from blow off assembly to cup building ok to cover. Still needs tested.
|
Water and/or Sewer | 1/2/2018 | 1/3/2018 | 1/3/2018 | P | DONE |
Eric Strole
|
|
|
On site meeting request for bld 39 outfall line. 1:00pm, contact Jake Cook Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on waste water line.
|
Water and/or Sewer | 12/19/2017 | 12/22/2017 | 12/21/2017 | P | CANC |
Bill VanDegrift
|
|
|
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 12/19/2017 | 12/22/2017 | 12/21/2017 | A | CANC |
Bill VanDegrift
|
|
|
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 12/19/2017 | 12/21/2017 | 12/21/2017 | P | PART |
Bill VanDegrift
|
|
|
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer up to the building service, west side of the service road, will call Eric when ready to continue.
|
Water and/or Sewer | 12/19/2017 | 12/21/2017 | 12/21/2017 | A | PART |
Bill VanDegrift
|
|
|
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 12/19/2017 | 12/20/2017 | 12/20/2017 | P | PART |
Eric Strole
|
|
|
100' of 8" potable waterline installed so far.
|
Water and/or Sewer | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | PART |
Eric Strole
|
|
|
40' of 8" potable waterline installed so far.
|
Water and/or Sewer | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | DONE |
Eric Strole
|
|
|
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on inspections
|
Water and/or Sewer | 11/28/2017 | 11/28/2017 | 11/28/2017 | P | PART |
Eric Strole
|
|
|
112' of 8" sewer installed today.
|
Water and/or Sewer | 11/27/2017 | 11/27/2017 | 11/27/2017 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PART |
Eric Strole
|
|
|
installation of sewer tie in manhole and 8in line heading to building 39. Ben Scott primary contact onsite. Phone #: ###-#### Inspection requested via web by Craig Fischer-Another 84' installed.
|
Water and/or Sewer | 11/22/2017 | 11/22/2017 | 11/22/2017 | A | PART |
Eric Strole
|
|
|
installation of sewer tie in manhole and 8in line heading to building 39. Ben Scott primary contact onsite. Phone #: ###-#### Inspection requested via web by Craig Fischer-84' of 8" sewer from mainhole to building installed so far.
|