Permit Information
Permit NumberPLM17-04664
StatusFinaled
Name WARNER CONSTRUCTION
Site Address 8000 S FEDERAL WAY
Project NameMicron B39 CUP
Customer NumberC29420
ePlanReviewNo
Description
Alteration: Installation of new 8in and 4in sewer line with manholes.
Installation of new 8in and 4in potable water service.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/5/20192/6/20192/6/2019APASS
DetailsEric Strole
Final inspection close out of all systems for Micron Bld 39. Ben Scott primary contact onsite. Phone #: ###-#### Inspection requested via web by Craig Fischer
PLM-Aging Inspection1/10/20191/10/20191/10/2019 PART
DetailsEric Strole
wip
Roof Drains10/11/201810/11/201810/11/2018PPART
DetailsDaryl Spivey
ride along with Eric
Roof Drains10/11/201810/11/201810/11/2018PPART
DetailsEric Strole
Connection of roof drain leaders on North-East corner and East side of Building 39 to storm drain system. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section complete pass.
PLM-Aging Inspection8/29/20188/29/20188/29/2018 PART
DetailsEric Strole
wip
Roof Drains5/30/20185/30/20185/30/2018PCANC
DetailsEric Strole
Connection of 8in Roof Drain Leader on North side of building 39 to storm drain system. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
Water and/or Sewer4/25/20184/26/20184/26/2018APASS
DetailsEric Strole
Testing of 18in Waste Water Outfall lines form Building 39 to Federal Way. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Test on waste water pass.
Water and/or Sewer4/17/20184/18/20184/18/2018APART
DetailsEric Strole
Tie-in complete
Water and/or Sewer4/16/20184/17/20184/17/2018PNR
DetailsEric Strole
Water and/or Sewer4/12/20184/16/20184/16/2018ANR
DetailsEric Strole
No gain
Water and/or Sewer4/11/20184/12/20184/12/2018APART
DetailsEric Strole
Up to 4th manhole of 18" waste water.
Water and/or Sewer4/10/20184/11/20184/11/2018APART
DetailsEric Strole
Up to 3rd manhole of 18" waste water.
Water and/or Sewer4/9/20184/10/20184/10/2018PCANC
DetailsEric Strole
Water and/or Sewer4/9/20184/10/20184/10/2018APART
DetailsEric Strole
Up to 2nd manhole and 14' out of manhole of 18" waste water installed so far.
Water and/or Sewer4/9/20184/9/20184/9/2018PPART
DetailsEric Strole
Another 35' of 18" installed
Water and/or Sewer4/6/20184/9/20184/9/2018APART
DetailsEric Strole
Eric, I set this up , they may call it in also. they were setting the first manhole when I left Friday. Bill,-70' of 18" from 1st manhole towards cup building installed.
Water and/or Sewer4/6/20184/6/20184/6/2018PPART
DetailsBill VanDegrift
Installation of 18in Waste Water line from Building 39 to Federal Way tie-in point. Ben Scott primary contact on site Phone #: ###-#### Inspection requested via web by Craig Fischer setting the first manhole.
Water and/or Sewer3/21/20183/22/20183/23/2018APART
DetailsEric Strole
Connection of 18in Waste Water line to Building 39. Ben Scott primary contact onsite Phone #: ###-#### Inspection requested via web by Craig Fischer-Tie-in of 18" waste water to cup building pass. Video of 8" sewer pass. 2 small bellys. Told Micron is ok with sewer.
Water and/or Sewer3/13/20183/14/20183/14/2018APASS
DetailsEric Strole
Pressure testing of Potable Water connection to Building 39. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Test pass.
Water and/or Sewer3/1/20183/2/20183/2/2018APART
DetailsEric Strole
144' installed so far.
Water and/or Sewer2/28/20183/1/20183/1/2018PCANC
DetailsEric Strole
Water and/or Sewer2/28/20183/1/20183/1/2018APART
DetailsEric Strole
!00' off 18" installed so far.
Water and/or Sewer2/28/20182/28/20182/28/2018PPART
DetailsEric Strole
Start of 18in Waste Water line from building 37 to existing connection point in parking lot. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer- 20 ' of 18" in so far.
Water and/or Sewer2/6/20182/6/20182/6/2018PPASS
DetailsBill VanDegrift
12:00 PM Conferance on sewer 18" ww
Water and/or Sewer2/5/20182/6/20182/6/2018PDONE
DetailsEric Strole
Conference call with Jake Cook about 18in WW outfall line. Contact Jake Cook onsite Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on sewer.
Water and/or Sewer2/1/20182/2/20182/2/2018APART
DetailsEric Strole
Finish installation of 8in sewer line on West side of Building 39, installation of sewer manhole on West side of Building 39, connection of 4in to building. Ben Scott on site contact. Phone #: ###-#### Inspection requested via web by Craig Fischer-4" sewer from manhole to building complete. All needs tested.
Water and/or Sewer1/31/20182/1/20182/1/2018APART
DetailsEric Strole
Finish installation of 8in sewer line on West side of Building 39, installation of sewer manhole on West side of Building 39, connection of 4in to building. Ben Scott on site contact. Phone #: ###-#### Inspection requested via web by Craig Fischer-28' of 8" sewer from manhole to building installed.
Water and/or Sewer1/31/20181/31/20181/31/2018PPART
DetailsEric Strole
Installation of 8in potable water blow off assembly. West side of bld 39. Morning inspection if able. Ben Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-8" potable water to blow off assembly & 4" from blow off assembly to cup building ok to cover. Still needs tested.
Water and/or Sewer1/2/20181/3/20181/3/2018PDONE
DetailsEric Strole
On site meeting request for bld 39 outfall line. 1:00pm, contact Jake Cook Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on waste water line.
Water and/or Sewer12/19/201712/22/201712/21/2017PCANC
DetailsBill VanDegrift
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
Water and/or Sewer12/19/201712/22/201712/21/2017ACANC
DetailsBill VanDegrift
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
Water and/or Sewer12/19/201712/21/201712/21/2017PPART
DetailsBill VanDegrift
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer up to the building service, west side of the service road, will call Eric when ready to continue.
Water and/or Sewer12/19/201712/21/201712/21/2017APART
DetailsBill VanDegrift
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
Water and/or Sewer12/19/201712/20/201712/20/2017PPART
DetailsEric Strole
100' of 8" potable waterline installed so far.
Water and/or Sewer12/19/201712/20/201712/20/2017APART
DetailsEric Strole
40' of 8" potable waterline installed so far.
Water and/or Sewer12/19/201712/19/201712/19/2017PDONE
DetailsEric Strole
8in potable water. Connecting to existing line, then heading South to building 39 connection. Ben Scott primary on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on inspections
Water and/or Sewer11/28/201711/28/201711/28/2017PPART
DetailsEric Strole
112' of 8" sewer installed today.
Water and/or Sewer11/27/201711/27/201711/27/2017ACANC
DetailsEric Strole
Water and/or Sewer11/22/201711/22/201711/22/2017PPART
DetailsEric Strole
installation of sewer tie in manhole and 8in line heading to building 39. Ben Scott primary contact onsite. Phone #: ###-#### Inspection requested via web by Craig Fischer-Another 84' installed.
Water and/or Sewer11/22/201711/22/201711/22/2017APART
DetailsEric Strole
installation of sewer tie in manhole and 8in line heading to building 39. Ben Scott primary contact onsite. Phone #: ###-#### Inspection requested via web by Craig Fischer-84' of 8" sewer from mainhole to building installed so far.