Final | 5/18/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Dan Ediger
|
|
|
will be ready at 11:00 Phone #: ###-#### Inspection requested via web by jeff flatt
|
Plumbing Rough-in | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | FAIL |
Dan Ediger
|
|
|
should be ready by 11 Phone #: ###-#### Inspection requested via web by jeff flatt. Increase the A/W box drain to 2"
|
Other | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | PASS |
Dan Ediger
|
|
|
Conference - Jeff Phone #: ###-####
|