Final | 7/19/2018 | 7/19/2018 | 7/20/2018 | P | PASS |
Bill VanDegrift
|
|
|
Please call Steve when in route Phone #: ###-#### Inspection requested via web by steven smith
|
Final | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PART |
Bill VanDegrift
|
|
|
Please call Steve when in route Phone #: ###-#### Inspection requested via web by steven smith will final when the permit is updated to reflect all of the fixtures.
|
Plumbing Rough-in | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Bill VanDegrift
|
|
|
please call steve prior to arrival for access into house. Phone #: ###-#### Inspection requested via web by steven smith
|
Plumbing Rough-in | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith-Need to trap & vent shower. Need to use mission couplings from abs to cast iron. Need to fix reverse grade on dwv. Need to hook up all waterlines in crawl. Missing nailplates. Need to be 6" above flood level rin before tieing vents together. Need to test dwv & water. Guest bathroom roughed in and covered up without any inspections.
|