Final | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Eric Strole
|
|
|
If questions call Efrain @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PART |
Eric Strole
|
|
|
CALL 30 MINS PRIOR so Efrain can meet you on site ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-Need to label all backflows & if there is not a backflow on model trimmer need to add one.
|
Med/Gas Systems | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Eric Strole
|
|
|
if questions call Jim Little @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Med/Gas Systems | 3/19/2018 | 3/20/2018 | 3/20/2018 | P | CANC |
Eric Strole
|
|
|
There is a parcel hold till electrical permit is issued.
|
Plumbing Rough-in | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PART |
Eric Strole
|
|
|
Plumbing Rough-in ; Med Gas inspection - Lock box if needed 1027. If questions call Jim @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-R/I pass. Start of 24 hr test on med gas.
|
Med/Gas Systems | 12/14/2017 | 12/18/2017 | 12/18/2017 | A | PEND |
Eric Strole
|
|
|
Med gas ; plumbing Rough-in Inspection. If questions call Gary @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-A building permit is required. No inspections till building permit is issued.
|