PLM-Aging Inspection | 9/18/2018 | 9/18/2018 | 9/18/2018 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 9/18/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | PART |
Eric Strole
|
|
|
Test on interceptors pass. North side interceptor still needs baffles.South side interceptor still needs all piping.
|
Water and/or Sewer | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PART |
Eric Strole
|
|
|
PM is Mike Jackson # ###-####. call with any ?''s. Phone #: ###-#### Inspection requested via web by judy patton-Start of 24 hr test on interceptors.
|
Water and/or Sewer | 12/15/2017 | 12/19/2017 | 12/19/2017 | A | CANC |
Eric Strole
|
|
|
This project will require 2 inspections. Second later after the first portion is completed. PM Mike Jackson ###-#### Thank you! Phone #: ###-#### Inspection requested via web by judy patton
|